0
STOCK TRANSFER PROCESS IN MM –PART 1

Stock transfer can be done from one company code to another company code, one plant to another plant and one storage location to another storage location.

Ex: Cycle manufacturing company many have two or three plants for the production of different parts. The parts can be transferred from one plant to another plant.

There are two different ways to stock transfer
· One step Transfer
· Two step transfer

One step transfer

In one step process the stock can be transferred from one location to another in single step.
The following transactions are carried out.
Goods issue (issuing location)
Good receipt (Receiving location)

Scenario 1: Stock Transfer Storage location to Storage location within plant

Step 1: 

1) Go to T-Code MIGO_TR
2) Enter the movement type ( 311- One storage location to another within the plant)
3) Enter ( Material ,Plant,Qty )
4) Enter the From Storage location (Sending) and Destination Storage location (Receiving) that is (WH -0001 to WH-0002).
5) No accounting document will be created. Since there is no change in Stock valuation.
6) Check the stock report in ( t-code :MMBE)



STO 1


Scenario 2: Stock Transfer one plant to another plant.

Step 1:

1) Go to T-Code MIGO_TR
2) Enter the movement type ( 301- One Plant to another plant)
3) The Material should be maintained in both the plants.
4) Enter ( Material ,Qty,Storage Loc )
5) Enter the From Plant (Sending) and Destination Plant (Receiving) that is (6650-Riyadh  Plant to 6651-Jeddah Plant).
6) The Accounting document will be created if the Valuation is at plant level. If valuation at company code level no accounting document will be generated
7) Check the stock report in ( t-code :MMBE)

 
STO 2

Post a Comment

 
Top